Thittawee Tangcharatwong
About Thittawee Tangcharatwong
Thittawee Tangcharatwong is the Platong Production Optimization Team Lead at Chevron in Bangkok, with over two decades of experience in various roles at the company.
Title
Thittawee Tangcharatwong holds the title of Platong Production Optimization Team Lead at Chevron. This role encompasses overseeing the optimization of production processes and ensuring the effective maneuvering of the project team under his leadership in Bangkok.
Current Position at Chevron
Thittawee Tangcharatwong is currently working at Chevron in Bangkok as the Platong production optimization team lead. In this position since May 2018, he is responsible for enhancing production efficiency and optimizing operations to ensure optimal performance of the Platong project.
Previous Roles at Chevron
Thittawee Tangcharatwong has served in various critical positions throughout his tenure at Chevron. He was the LEAP Asset Lifecycle lead from 2017 to 2018 in Houston, Texas. From 2015 to 2017, he worked as a Project Manager and Reserves & Business Plan lead in Rio de Janeiro, Brazil. Between 2012 and 2014, he was a Reservoir Engineer in the same region. Earlier, he led the Platong GasII petroleum engineer team from 2010 to 2012 and worked as a Petroleum Engineer from 2009 to 2010 in Bangkok. From 2006 to 2009, he was an Economic and Decision Analyst, and his earlier role was as a Petroleum Engineer from 2000 to 2006.
International Experience
Thittawee Tangcharatwong has gathered extensive international experience over his career. His professional assignments have taken him to Thailand, the United States, and Brazil, reflecting a global perspective in his work. His tenure in diverse geographies has equipped him with insights into varied operational dynamics and cultural contexts.
Engineering and Economic Analysis Expertise
With over two decades of experience at Chevron, Thittawee Tangcharatwong has developed a robust background in both engineering and economic analysis. His role as an Economic and Decision Analyst for three years demonstrates his capability in evaluating economic impacts and making strategic decisions. His diverse roles underscore his depth of expertise in these critical areas of Chevron’s operations.
Project Management Versatility
Thittawee Tangcharatwong has demonstrated considerable versatility in project management during his tenure at Chevron. He has managed production optimization projects and led asset lifecycle projects, evidencing his proficiency in handling varied and complex projects effectively. This versatility is pivotal in managing Chevron’s diverse and extensive operations.