Andrey Kolomeytsev

Andrey Kolomeytsev

Drilling Supervisor @ ExxonMobil

About Andrey Kolomeytsev

Title

Andrey Kolomeytsev currently holds the title of Drilling Supervisor at ExxonMobil.

Professional Experience at ExxonMobil

Andrey Kolomeytsev began his career at ExxonMobil in 2011 as a Well Site QA/QC Engineer in Sakhalin, a role he held for two years. In 2013, he transitioned to the position of Drilling Supervisor at ExxonMobil, also based in Sakhalin. In this capacity, he oversees drilling operations, ensures technological compliance, controls HSE programs like STOP and HID, and interacts with office-based drilling engineers to ensure project alignment. His responsibilities also include coordinating contractor work, conducting job safety analyses, and maintaining detailed drilling operation records.

Previous Roles at TNK BP

Before joining ExxonMobil, Andrey Kolomeytsev worked at TNK BP. He served as a Drilling Engineer in Tyumen from 2007 to 2010, followed by a brief tenure of three months in 2010 as a Drilling Engineer in Buzuluk. In these roles, he gained meaningful experience in various drilling operations, including the successful execution of specific technical tasks.

Education and Technical Expertise

Andrey Kolomeytsev earned his engineering degree in the oil and gas industry from Ufa State Petroleum Technological University, where he studied from 2002 to 2007. His education provided a strong foundation in petroleum technologies, which he has continually applied throughout his professional career. Andrey has specialized knowledge in managing offshore drilling projects and has worked on the Berkut Platform. His expertise includes drilling extended reach wells, coordinating contractor work, conducting equipment audits, and performing JSA before work commencement.

Key Drilling Operations

Andrey Kolomeytsev has been instrumental in monitoring and managing several critical drilling operations. He oversees various phases like FDP, casing preparation and running, cementing, well completion, and diesel displacement. Additionally, he is experienced in driving 30" pipe and running floated 9-5/8" liner. His role also involves documenting all drilling activities in Well View reports. Notably, he has successfully drilled extended reach wells with a measured depth of 13,000 meters using a land rig.

People similar to Andrey Kolomeytsev